Bulldozer Excavation Quotes

Get Professional Services

Cost of Bulldozer Excavation in Moorhead

The cost of bulldozer excavation in Moorhead, MN, can vary widely depending on several factors. Whether you're preparing a site for construction, clearing land, or performing other excavation tasks, understanding the costs involved is crucial for budgeting and planning.

Factors Affecting Cost

  • Project Size: Larger projects typically require more time and resources, increasing the overall cost.
  • Soil Type: The type of soil being excavated can affect the difficulty and duration of the work.
  • Depth of Excavation: Deeper excavations generally require more effort and specialized equipment.
  • Accessibility: Easy-to-reach sites are less expensive to excavate compared to those with limited access.
  • Equipment Needed: Different tasks may require specific types of bulldozers or additional machinery.
  • Labor Costs: The cost of labor can vary depending on the skill level required and local wage rates.
  • Permits and Regulations: Obtaining necessary permits and adhering to local regulations can add to the overall cost.

Average Costs for Common Tasks

Task Average Cost (Moorhead, MN)
Basic Land Clearing $1,200 - $4,000 per acre
Foundation Excavation $1,500 - $3,500
Pool Excavation $2,000 - $7,000
Trenching for Utilities $30 - $70 per linear foot
Grading and Leveling $1,000 - $3,000 per project
Road Construction Preparation $3,000 - $10,000 per mile

Understanding these factors and average costs can help you better plan your bulldozer excavation project in Moorhead, MN.

Bulldozer Excavation